Back to Listings

2006 Sea Ray 320 Sundancer

Change Order

Honolulu, Hawaii, United States
$84,500USD
$116,428 CAD
32'Length
2006Year
1Heads
Power
Fiberglass
Gas/Petrol
Used

There's nothing quite like the exhilarating profile of this sleek 320 Sundancer. Its dramatic lines and bold colors make everything else look like it's sitting still.

Overview

Exciting features include cockpit wet bar with Corian counter, extra-wide bench-style helm seating with two flip-up thigh-rise bolsters, optional underwater swim platform lighting, premium cabin surround sound, and lots more.


Reel Deal Yachts is pleased to assist you in the purchase of this vessel. This boat is centrally listed by Honolulu Yacht Brokerage. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel

Specifications

Dimensions

Length Overall35' 6"
Beam11' 5"
Draft3' 7"

Details

Year2006
ManufacturerSea Ray
Model320 Sundancer
CategoryCruisers
TypePower
Hull MaterialFiberglass

Accommodation

Heads1

Performance

Fuel TypeGas/Petrol

Tank Capacities

Fuel200 gal
Fresh Water40 gal
Holding28 gal

Registration

HIN/IMOSERT7780K506

Engines

Engine 1MerCruiser MAG MPI
InboardType
350HP
261KW
Engine 2MerCruiser MAG MPI
InboardType
350HP
261KW

Full Details

Overview

Manufacturer Provided Description

There's nothing quite like the exhilarating profile of this sleek 320 Sundancer. Its dramatic lines and bold colors make everything else look like it's sitting still. Exciting features include cockpit wet bar with Corian counter, extra-wide bench-style helm seating with two flip-up thigh-rise bolsters, optional underwater swim platform lighting, premium cabin surround sound, and lots more.

Disclaimer

The company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change or withdrawal without notice.

Listing MLS by Yachtr.com

Contact Us

Interested in this Sea Ray?

Send us a message and our expert brokers will get back to you within 24 hours

Inquiring About2006 Sea Ray 320 SundancerChange Order$84,500
Reel Deal Sales
Your Listing Broker

Reel Deal Sales

Reel Deal Yachts

Reel Deal Yachts

Location
19790 W Dixie Hwy
PH-1
Miami, FL, 33180

Prefer to Talk?

Call us directly to speak with an expert broker.

Call 1-305-796-0040
Chat with us